Design considerations for photovoltaic cable management on brownfield sites

By Roger Jette, President, Snake Tray

Creating Value from Unusable Land

America’s insatiable appetite for electricity has energy producers building utility-scale solar arrays and battery energy storage systems (BESS) on lands deemed unsuitable for agricultural, residential or commercial purposes, a.k.a. brownfields.

Examples include depleted farms, abandoned shopping malls, airports and manufacturing facilities, capped landfills, decommissioned strip mines and Superfund sites. All share one common trait: trenching is impossible or prohibited.

  • Impossible when the land is covered by asphalt or concrete or has water, sewage and power lines underground. Landfills are often covered by an impenetrable membrane.
  • Prohibited when the location is former farmland, a landfill or Superfund site and trenching could expose toxic waste and contaminate water supplies.

These conditions require flexible, above-ground cabling solutions that do not involve digging.

Brownfield Solar: Take out the TRASH

Let’s examine several brownfield design parameters using our T.R.A.S.H. methodology as a guide:

Terrain and Substrate

Most landfills have a thin, flat crest with sloped sides. Slanted topologies prevent water pooling but impact how cable conveyance maps to changes in site contour.

  • Will the conveyance need to change direction vertically or horizontally? Should it run perpendicular or parallel to the slope? Every change in elevation and direction increases cost with extra parts to navigate turns.
  • Is the landfill membrane impenetrable, or is limited penetration allowed for driven piles? If the site has a concrete or asphalt base, can racking be bolted to the surface? If not, the PV arrays and cable conveyance will need to be anchored to precast concrete ballasts or Gabion baskets (wire cages filled with rocks).

TIP: Align cable conveyance routes in straight lines to minimize turns and elevation changes whenever possible for a simpler, more economical installation.

Racking

What type of racking system will be used to stand up the PV panels? This affects design and cost by determining whether the racking can support cabling or if a separate system is needed.

Is the racking approved for cable conveyance?

  1. Yes; use what’s there. The first option is bolting conveyance hardware to the racking system already in place to leverage project infrastructure.
  2. Yes; use more of what’s there. If the cabling requires additional support between panels, option two is to use more of the same components (piles, ballast blocks, etc.) sourced from the same vendor so installers know how to proceed.
  3. No; the racking is off limits. Cable conveyance must be run independently if the manufacturer stipulates the racking system cannot support the weight of the cables. Various ballasted and unballasted options are available to create a parallel pathway.
    TIP: Anticipate the weight of the tray and cables in addition to PV panels when evaluating racking system load capacities.

Array Plan and Access Pathways

Cable conveyance will inevitably traverse pathways, roads and rights-of-ways that must remain clear for operations, maintenance and vegetation control. Plan around obstacles and leave sufficient space for vehicles and mowing equipment between rows.

  • Are there designated areas, roads or egresses on the site that cannot be touched?
  • What type of vegetation will regrow post-construction? Are alternate landscape control methods such as gravel or chemical eradication possible?

TIP: On grassy fields, ensure cable trays are mounted at sufficient height for lawn mowers to pass safely underneath.

System Topology

How is the DC power generated by solar arrays converted into AC current usable by the grid? The positioning of inverters, combiners, transformers and disconnects affects how PV components interact with one another and determines conductor schedule at different points.

  • Are inverters distributed around the array with AC brought back to various points of interconnection, or does the array feature DC combiners or load break disconnects (LBDs) that combine string cables into larger conductors that connect to a centralized inverter?

Topology also includes the ancillary circuits that manage comms/data, auxiliary power, SCADA systems and the motors that allow the solar panels to track the sun.

TIP: Provide engineers with a schematic design, single-line diagram, conductor schedule and plan view with circuit routing to specify the right types of conveyances across the project.

Harsh Environment

To what hazards might the cable tray be exposed? Is the site near a body of salt water? These answers help determine the type of materials and weatherproofing necessary to ensure components last the life of the project.

  • Are there concerns due to landfill off-gassing (methane vents) or proximity to salty air? Choose the proper material and finish that provides the best resistance to corrosion and failure in harsh environments.
  • Is pest mitigation a problem? What types…insects, rodents, deer? Fully enclosed trays keep insects away from cables. Ventilated tray covers prevent animals from chewing on cables while maintaining air flow.
  • How will vegetation management be handled? Exfoliant overspray can damage conveyance materials. Ensure the right kind of finish is applied to the tray.

TIP: Consult the Engineer of Record or the regulatory Authority Having Jurisdiction (AHJ) over the site to determine the minimum level of corrosion resistance required for the area.

Transform Useless Land into Energy Producing Assets

Brownfields represent fertile ground for utility-grade solar plants – it’s one of the few uses left for otherwise useless land.

In this article we’ve merely scratched the surface of brownfield construction considerations. Those interested in further   zinformation are encouraged to contact the company to learn how Snake Tray makes it easy to transform useless land into profitable energy producing assets (www.snaketray.com).

Q3 2026